Cómo instalar su Solar-Cop

actualización 1.png
actualización 2.png

1. Rivit el conector Solar-Cop al centro del panel.

2. Taladre orificios para los ojales del Solar-Cop y atorníllelos al panel.

3. Taladre un agujero para la tapa del extremo Solar-Cop.

Pase el cable de apertura de 2 núcleos a través de los ojales de Solar-Cop desde el lado de la tapa del extremo Conecte los dos cables al conector de Solar Cop Coloque la tapa del extremo de Solar-Cop en el cable y colóquelo en el orificio y asegúrese de que el cable esté bien sujeto con la tapa final Conectar al sistema de alarma

policía solar
Conector

policía solar
Ojal

policía solar
Ojal

policía solar
Ojal

policía solar
Ojal

policía solar
Tapa final

Debajo del panel solar
Conector Solar-Cop
Ojal de policía solar
Tapa final Solar-Cop
3 zonas conectadas

Various Kit Options

a diagram of a solar panel

Solar-Cop offers a versatile range of products designed to meet your specific requirements, allowing for seamless interchangeability to suit your needs.

Firstly, you'll choose between the 1/3 Spring-loaded or Springless connectors. The distinction lies in their operation: one utilizes a spring release mechanism while the other is hard-wired. Opting for the hard-wired connector ensures no false alarms, whereas the spring-loaded variant may be prone to them. The choice is yours, with both options readily available.

Next, consider the grommets, comprising 2/3 of your selection. These are essential for routing wires through the solar panel frames. Option 2A/3 features rubber grommets ideal for larger holes, measuring 14x9, while 2B/3 serves the same purpose but for smaller holes, sized at 10x7. They prevent wire chafing and breakage, ensuring durability and reliability.

Completing your setup is the 3/3 Solar-Cop end cap. This component can be affixed directly to the panel or inserted into either 2A/3 or 2B/3 to secure the wire tautly. Its slightly elongated design allows for custom fitting by cutting and adding pieces to achieve the desired wire tension.

For installation, kits are tailored to your approach:

  • If drilling into your panel's frame is permissible, opt for 1/3 Spring-loaded or Springless connectors along with 2/3 grommets, followed by 3/3 end caps.

  • Alternatively, for installations where drilling voids warranty, choose 1/3 Spring-loaded or Springless connectors paired with either 2A/3 or 2B/3 grommets, and complete the setup with 3/3 end caps.

Remember, all configurations require the use of our outdoor 2-core ripcord, specifically designed for outdoor applications, ensuring longevity and performance in various weather conditions.